Multipurpose Building

Progress Photos

May 30

May 23

May 23

May 16

May 16

May 16

May 9

May 9

May 2

May 2

April 25

April 25

April 25

April 11

April 11

March 21

March 21

March 21

March 14

March 7

March 7

February 28

February 17

February 10

February 10

February 3

February 3

January 27

January 27

January 24

January 20

January 17

January 17

January 17

January 13

January 6, 2025

January 6, 2025

January 6, 2025

January 3, 2025

January 3, 2025

December 30, 2024

December 20, 2025

December 13, 2024

December 6, 2024

November 22, 2024

November 22, 2024

November 22, 2024

November 11, 2024

November 11, 2024

Construction (November 2024-present)

  • installation of fencing and site set-up
  • staking out utilities and building layout
  • working with subcontractors on documents and submittals for materials
  • issuance of building permit
  • demo and stripping of the topsoil
  • stockpiling topsoil
  • proofrolling and getting the pad ready
  • preparation of building pad
  • installing silt fence
  • laying additional rock to protect the building pad and the pathway to the building pad
  • delivery of pre-engineered building
  • digging and pouring concrete footers for building
  • forming and pouring foundation walls
  • setting anchor bolts in place
  • waterproofing and insulating the footers
  • erecting the building 
  • completing the structure of the building
  • completing the siding
  • backfilling the perimeter of the foundation wall
  • hanging main steel 
  • hanging siding panels
  • cleaning up ruts and soft soil
  • completing electrical and plumbing work under the concrete slab
  • installing banding for the roof
  • beginning roof insulation
  • finishing the roofing and ridge cap
  • starting gutters and finishing trim
  • prepping and pouring concrete for the slab on grade
  • finishing gutters
  • cleaning site ruts and tracks
  • staking storm and sanitary pit
  • finishing the building trim and cleaning the building panels
  • beginning framing with metal studes for walls
  • completing storm drain
  • completing electrical and plumbing rough-in
  • beginning to sheath main room
  • hanging drywall, mudding, and finishing
  • finishing electrical install
  • completing insulation
  • topping off drywall
  • spreading topsoil and seed
  • installing exterior frames and doors
  • painting steel and ceiling structure
  • finalizing the sanitary pit
  • distributing top soil
  • applying final paint
  • finishing exterior doors
  • completing electrical finishes
  • installing sanitary pumps
  • finishing electrical, mechanical, and plumbing
  • installing lockers
  • installing wall bases
  • continued inspections by county and testing agencies

updated June 17, 2025

Pre-Construction (June-October 2024)

  • site survey for grade, utilities, drainage, etc.
  • soil borings to determine soil materials, moisture content, and bearing capacity
  • electrical engineer on site
  • sanitary study
  • review of floor plans and specifications
  • technology/mechanical coordination
  • final review of drawings
  • issue of stamped permit
  • Greene County Public Health permit approved
  • Greene County building permit issued